Position: 首页 < Home < News < Company News

Tan Zhongming, the General Manager of the Sinoma Group Had an Inspection to the Sinoma-EC Waste Heat Generating Project in Chuzhou

PublishDate:2009-06-29 Source:

The general manager of Sinoma Group Tanzhongming visited the BOT waste heat generating project in Chuzhou in March, which is invested by Sinoma-EC. Miu Xuegang, the Mayor of Chuzhou; Gao Yunlian, the Board Chairman of the Pearl Group; Yu Mingqing, the Vice President of Sinoma-EC; Liu Yan, the Board Chairman of Sinoma Advanced Materials Co., Ltd; Zhang Qi & Liu Chunyan, the Board Chairman and Vice General Manager of Sinoma-EC; and related leaders of the city of Chuzhou Government and the town of Fengyang were going with Mr. Tan.

The Pearl Waste Heat Generating project in Chuzhou is going on smoothly at present. Installation of the equipments has already been done, while systematic commissioning is up to date. Synchronization and generation is in anticipation with in this month. After this waste heat generation is built up, the power production will be about 70 million Kwh per year, standard coal saving will be more than 30 thousands tons, CO2 discharging will reduce for more than 60 thousands.

Mr. Tan talked with the workers on site about the process of the project, and also visited the main workshop to look over the turbine, generator and other core equipments of the generation.

Energy conservation and waste reducing is an international trend which is also accord to the Chinese policy of sustainable social and economic development. The waste heat generation service of Sinoma-EC promotes the related technology development in construction material, metallurgy, nonferrous metal, chemical and other industries with high energy consumption. Mr. Tan pays high attention on Chuzhou waste heat generation project of Sinoma-EC consistently.

The mayor Miu Xuegang made a welcome presentation on Sinoma-EC’s investment in Chuzhou, even broader and closer cooperation are being expected.